Educational License - Primavera P6 Professional (PPM) - 1 Year

Special Discount 19%

9,779 SAR

12,000 SAR
Save
VAT Inclusive
In Stock

لتفعيل هذه الرخصة، نطلب بريدًا إلكترونيًا تعليميًا أو بريدًا إلكترونيًا من مؤسسة تعليمية. يرجى تقديمه مع طلبك.



To activate this license, we request an educational email or an email from an educational organization. Please submit it along with your request.



Primavera P6 – Project Portfolio Management Software

Primavera P6 by Oracle is one of the most powerful, reliable, and globally used tools for project management, scheduling, and portfolio planning. It is trusted by project managers in construction, engineering, oil & gas, manufacturing, defense, and IT industries to manage complex, large-scale projects with confidence.

Primavera P6 helps organizations plan, manage, and control project activities, resources, timelines, and costs across multiple projects—while ensuring compliance and risk mitigation.


Key Features:

  • Advanced project scheduling with Gantt charts and critical path analysis
  • Multi-user, multi-project environment
  • Resource and cost management tools
  • Forecasting, baseline comparison, and earned value management (EVM)
  • Dashboards and reports for real-time visibility
  • Integration with ERP systems, Excel, and Oracle DB
  • Suitable for projects ranging from small tasks to mega programs


Ideal for: Project managers, planners, schedulers, and executives in construction, infrastructure, engineering, and capital-intensive industries.


Minimum System Requirements for Primavera P6

Operating System:

  • Windows 10 or 11 (64-bit)
  • Windows Server 2016 or newer (for enterprise/database setups)


Processor:

  • Intel Core i5 or higher
  • Recommended: Intel i7/i9 or AMD Ryzen 7/9 for large schedules


Memory (RAM):

  • Minimum: 8 GB
  • Recommended: 16 GB or more


Disk Space:

  • Minimum: 6 GB free space for installation
  • Recommended: SSD for faster project file handling and database performance


Database Requirements:

  • SQLite (default for standalone use)
  • Oracle Database or SQL Server (for enterprise deployment)


Display:

  • Minimum resolution: 1366 × 768
  • Recommended: 1920 × 1080 or higher


Other Requirements:

  • Microsoft .NET Framework 4.8
  • Java Runtime (JRE) included in installer
  • Internet connection for updates and cloud services
  • Admin rights required for installation



Read more

9,779 SAR

12,000 SAR
Add to cart